Smoke System  
[Nov 2007] With the tank pushed into position, and the brackets firmly fastened to the tank, I marked lines on each bracket where the floor ribs were. The brackets will get pop riveted to the floor, and I wanted to maximize the number of rivets that go through a floor rib.  Lucky for me, btw, that I chose flush rivets initially for the floor.  The drawings don't call for that.  LP4-3 rivets called for would have prevented the brackets from sitting flush to the floor.  
Anyway, I drilled the brackets for 8-10 pop rivets each.  I was able to get 2-3 of those aligned with ribs on each bracket.

[Nov 2007] With the tank pushed into position, and the brackets firmly fastened to the tank, I marked lines on each bracket where the floor ribs were. The brackets will get pop riveted to the floor, and I wanted to maximize the number of rivets that go through a floor rib. Lucky for me, btw, that I chose flush rivets initially for the floor. The drawings don't call for that. LP4-3 rivets called for would have prevented the brackets from sitting flush to the floor.
Anyway, I drilled the brackets for 8-10 pop rivets each. I was able to get 2-3 of those aligned with ribs on each bracket.


Powered by Gallery v1 RSS